This project was carried out at London Luton Airport, where AAS Group Construction Ltd was appointed as a subcontractor to Royal Bridge Civil Engineering.
Our scope of works included the excavation and installation of a water storage tank, alongside comprehensive deep drainage and groundwater management systems. All works were executed in accordance with strict site regulations and engineering specifications, ensuring efficiency, safety, and long-term performance.
Copyright © 2025 All Rights Reserved AAS GROUP CONSTRUCTION LTD – Powered by DOTECH